福特政府在申请的改建绿化带地区
Here are the areas of land the Ford government wants to open up for development:
- King Township: east of Dufferin Street, south of Miller’s Sideroad and west of Bathurst Street.
- Vaughan: north of Teston Road, east of Pine Valley Drive.
- Richmond Hill: east of Leslie Street, north of Elgin Mills Road East and west of Highway 404.
- Whitchurch-Stouffville: 11861 and 12045 McCowan Road.
- Markham: 5474 19th Avenue.
- 10325, 10378 and 10541 Highway 48.
[metaslider id=”4546″]
- 10379 Kennedy Road.
- Pickering: West of West Duffins Creek, between Highway 407 and the CP Belleville rail line.
- Ajax: 765 and 775 Kingston Road East.
- Clarington: Northwest corner of Nash Road and Hancock Road.
- Hamilton: South of Garner Road West, between Fiddlers Green Road and Shaver Road.
- Hamilton: Between White Church Road East and Chippewa Road East, from Miles Road to Upper James Street.
- Grimsby: Between the GO rail line and Main Street West, from Oakes Road North to Kelson Avenue North.
- 502 Winston Road.
- Hamilton: 331 and 339 Fifty Road.
[metaslider id=”4559″]
这次提案包括15个不同区域总共征用7400英亩的土地,来建造至少5万套新房。
但该提案还指出,同时会在其他地方增加9400英亩的土地用作新的绿化带。如此一来,当旧的绿化带被征用后,新修建的绿化带面积将额外增加2000英亩。
最后大家都关心,到底谁会在这些土地中受益?
Pickering -DeGasperis family
Vaughan -DeGasperis family
Richmond Hill -DeGasperis family, Leslie Elgin Developments Inc.
King Township -Green Lane Bathurst GP Inc.
Stouffville – Toronto-based Torca II Inc., and Another numbered company — 2502536 Ontario Limited — owns the third piece of land. Corporate documents list its president as Weixiang Wang.
Markham – Wang is also president of three numbered companies
Flato Upper Markham Village Inc.
Minotaur Holdings
Clarington – Nash Road Developments Inc.
Ajax – The company’s main officer is Yuchen Lu, whose address is listed in Fuyang, China.
cite: cbc.ca